Skip to content
A plan view of the example site's hybrid park tilting into a close oblique view: battery storage, solar, a data centre, a flower strip, the substation with its overhead line and cable routes in a meadow landscape.

Plan faster. Less risk. One platform.

Planning software for energy projects. From land to a finished design.

Book a demo

CAD, QGIS, Excel. Now all in Voltplot.

Site plan

How a site comes together

Voltplot agent

  1. Find a suitable site and plan a battery storage system with solar PV on it.

  2. Site search

    I checked 24 parcels. This one fits best.

  3. Screening

    The site has 4.06 ha.

  4. Design

    I place 4 storage units, 10 MW and 20 MWh, with the solar PV next to them.

    Create design

    Create designAccepted

  5. Noise analysis per ISO 9613-2

    At most 39.8 dB at the nearest house.

  6. Fire safety check

    Spacing, footprint and height are within the reference values.

  7. Access road

    The access road is 6 m wide, gravel.

  8. Grid connection

    The nearest substation lists 16.5 MVA of free feed-in capacity.

  9. Site plan

    The site plan is ready.

  10. Your decision

    Ready for a decision.

    • Sitechecked
    • Grid connectioncapacity free
    • Permitready to submit
    • Financingopen

Everything that connects to the grid.

Hosted in the EU.Under GDPR.

For each role

Win more tenders?

Book a demo
“We don’t want another energy project to start from zero.”
Gründungsgarage logoAustria Wirtschaftsservice (aws)build! Gründerzentrum Kärnten
Andreas Mačnik and Hannes Lipusch, the founders of Voltplot.

Andreas Mačnik

Co-Founder & CEO

Hannes Lipusch

Co-Founder & CTO