Skip to content
Utility-scale battery energy storage installation in a European landscape at sunset, connected to a high-voltage transmission tower.

Plan battery storage projects faster.

Planning software for battery storage - site screening, 3D layouts, and reports for the next decision.

Wemaketheenergytransitionplannable.

For each role

Our promise.

Battery storage container being craned onto a construction site.

Suppliers & EPCs

Win more tenders.

Aerial view of an industrial parcel with high-voltage transmission line in the distance.

Project developers

Bring sites to ready-to-build.

High-voltage substation at dusk with switchgear and busbars.

Utilities

Strengthen security of supply.

Product

Planning software for energy projects.

We start with battery storage projects. We work closely with our first pilot projects — from site screening through 3D layout options to a decision basis.

30+Data sources

Site Screening

Relevant site, grid, permitting and project data in one traceable site picture.

01
3DPlanning

Layout Variants

Draw and compare battery, access, fence and cable layouts on real terrain.

02
BESSFocus

Constraints

Risks and constraints stay visible while options are compared.

03
Go/No-GoBasis

Planning Basis

Site, layout and assumptions become a handoff-ready basis for the next planning conversation.

04
How we work

Four steps to a Go/No-Go decision

Scattered data becomes a data-based Go/No-Go decision.

  1. Bring in your project

    Goals, scope and region in a first call

    Output: Initial read + clear next steps

  2. Screen sites

    Geodata, zoning and grid context

    Output: Prioritised sites

  3. Pre-planning & risks

    Layout on real terrain; noise, flood, protected areas …

    Output: Comparable layout variants + risk picture

  4. Decide with confidence

    Economics: revenue, cost, key figures

    Output: Defensible Go/No-Go basis

Platform

Site Analysis. 3D Layouts. Reporting.

BESS container array in 3D view on real terrain, with fence and access road

3D Layouts

Quickly draw and compare layouts.

Voltplot map showing a BESS layout on a project parcel with visible grid lines

Site Analysis

Screen sites with 30+ data sources.

Voltplot site report with noise map, layout overview and elevation profile

Automated Reports & Exports

Maps, layouts and economics — as PDF and DXF.

Hannes Lipusch and Andreas Mačnik, the founders of Voltplot.

Hannes Lipusch

Co-Founder & CTO

Andreas Mačnik

Co-Founder & CEO

The team

How Voltplot started.

We met in 2023 while working on a utility-scale battery storage project: Andi in project development, Hannes on the software side.

After that we worked separately. Andi led utility-scale battery storage projects at a startup and an energy provider, Hannes built AI and software systems.

Today we're building Voltplot. With what we know from real-world projects, and with AI where it actually helps. We start with utility-scale battery storage.

The same method is designed for repeated infrastructure-planning work in energy projects.

Gründungsgarage logoVol. XXVI
Project Review

Start with one site question.

We review it with Voltplot and show the planning basis it can become.